Portal Development Kit (PDK): this is a development kit.

Uses · Entertainment

For the people who build
the floor that sells tickets.

The Portal Development Kit (PDK) is a development kit for developers and integrators building location-based attractions.

Development Kit: early-access hardware, software in active development.

Supplied for development and evaluation use (Terms, Section 8.1). A paid public ride is an amusement device where local law says so — licensing, inspection, insurance, operator training — and the Terms do not cover those duties (Section 8.2).

The platform seen from directly above, showing the compact square footprint an operator has to find room for.

The floor maths

Three numbers an operator asks first.

Commercial operation — a venue, an attraction, paid rides — needs a Commercial Operator Agreement under the Development Kit Evaluation Agreement, Section 8. That agreement is not available yet. Tell us what you are planning; we may decline any request (Section 8.4).

Footprint

1.00 × 1.00 m for the PDK platform, 1.57 m in diameter with the extension feet. It fits a booth or a bay; the floor and mounting requirements are the rated limits in the Safety Manual.

Power

Standard mains, 100 to 290 V. No three-phase supply. Where the Installation Guide calls for a competent electrician, use one.

Duty cycle

Static weight sits on air rather than on the motors, so the motors move the rider rather than hold the load.

Proof on walk-up guests

Most of the people who
rode it had never been
on a motion platform.

The reaction that matters for an attraction is not the enthusiast's — it is the person who joined the queue because the queue was there. At SimRacing Expo Dortmund and Sim Gaming Expo, Schaumburg, Chicago, the platform ran back-to-back public floor days.

Each ride ran 3 to 5 minutes, at least 15 riders an hour. In Dortmund that was three days back to back, mostly first-time riders. Across three shows, Sim Gaming Expo 2026 included, more than 570 people signed up to ride.


Where it fits

Two formats.

Riders are 18 and over.

VR arcades and free-roam

4D motion driven over the open interface; synchronizing several rigs is your integration work.

4D screens and dark rides

A motion base for themed installations at single or multi-cabin scale — sized for a unit rather than a theater.

Keep reading

Active gaming

The same platform, where the physical effort is the point rather than a side effect.

The Ecosystem

What arrives, what it costs, and what you assemble.

Talk to us

For a question a page cannot answer.